|
net Scheduler
is the product within the net collection responsible
for manufacturing order management.
net Scheduler
provides visibility of the entire manufacturing environment
allowing the user community to enhance manufacturing productivity
through dynamic utilization of capacity and material resources.
The system is built utilizing control numbers referred to
as manufacturing orders. A manufacturing order may be created
as a make-to-order for a specific customer, or created from
net Pro Plan to
satisfy an aggregate demand.
The system will
automatically calculate the material and process requirements
to satisfy the product quantity on the manufacturing order.
The user may allocate inventory to satisfy the requirement
or allow the
system to automatically allocate. Net Scheduler may
be a paperless product or users may print bar-coded paperwork
for tracking on the floor including
BUSINESS FUNCTIONS
Production Calendars
Manufacturing Order Analysis
Inventory Allocation
Work Center Scheduling
Manufacturing Order Splits/Reworks Tracking
Machine Lineup Sequencing with Finite Dating Production Entry
|
|
the process route guide, manufacturing instructions,
tracking labels, as well as a pick list of raw materials allocated
to the manufacturing order.
net Scheduler
automatically calculates the capacity load that will be placed
on each work center and immediately builds a run schedule
for the manufacturing order specific to the work centers that
will be utilized. The users have the opportunity to manually
sequence manufacturing orders on a machine, or allow the system
to automatically lineup each machine. The systems dating
of manufacturing order run schedules is dynamically based
on finite capacity utilization.
net Scheduler
has a built in work-in-process tracking system that allows
user input at each step in the route, including starts, stops,
comments, associate responsible, and quantity being processed.
All history is maintained for percent return calculations,
variance analysis, and period-to-period comparisons.
|